The Management Board of BGS Energy Plus announces that its fully-owned subsidiary BGS Biogas a.s. on 20th September 2010 signed a contract for construction of a biogas plant of 620 kW located in Dobronin, Czech Republic with Dobrosev a.s., Střítežská 188/3, 588 12 Dobronín. The plant is scheduled to be built by Q4 2010.
The total contract value is CZK 49 000 000 (EUR 1 989 000).
BGS Energy Plus and its board members are unrelated to the principals of Dobrosev a.s., Dobronín .
Legal basis: § 3 ust.2 point 2 of the Appendix 3 to Resolution No. 733/2009 of the Warsaw Stock Exchange Management Board dated 18 December 2009 “Current and Periodical Information in the Alternative Trading System”