The Management Board of BGS Energy Plus announces that its fully-owned subsidiary BGS Biogas a.s. on 17th January 2012 signed a contract for construction of a biogas plant of 340 kW located in Plevnice, Czech Republic with SPV Pelhřimov, a.s. The plant is scheduled to be built by Q3 2012.
The total contract value is CZK 40 000 000 (EUR 1 569 000).
BGS Energy Plus and its board members are unrelated to the principals of SPV Pelhřimov, a.s.
Legal basis: § 3 ust.2 point 2 of the Appendix 3 to Resolution No. 733/2009 of the Warsaw Stock Exchange